
A 4830
- September 21, 1998
P&S 4394
TO: ALL PARTICIPANTS
ATTENTION: MANAGING PARTNER/OFFICER; OPERATIONS PARTNER/OFFICER; MANAGER CUSTOMER ACCOUNT TRANSFER DEPARTMENT; MANAGER MARGIN DEPARTMENT; MANAGER DATA PROCESSING DEPARTMENT; MANAGER MUTUAL FUNDS OPERATIONS; MANAGER CASHIERS DEPARTMENT
SUBJECT: ACATS REDESIGN - CONVERSION TESTS AND PARTICIPANT SYSTEM TEST INFORMATION
On Monday, January 25, 1999 and subject to SEC approval, NSCC plans to implement the redesign of the Automated Customer Account Transfer Service (ACATS). This notice provides information regarding the next phase of participant testing. It provides a detailed timeline of participant testing scheduled from mid-October through the implementation of the redesigned system. Part of the implementation is a conversion of data from the current system to the new system. Specific information regarding this conversion and the availability of conversion test files is contained on the following pages.
Additionally, specific information is being provided to aid participants in preparation for the ACATS participant system testing scheduled to begin Monday, November 16, 1998. Participants should have completed their network connectivity and format testing prior to the participant system test. Specific information needed from participants prior to Nov. 16th is documented on the following pages.
Section I describes the Participant Testing Schedule. Section II describes Conversion, which includes the schedule for conversion week-end beginning January 22, 1999; rules for converting current ACATS data to the redesigned ACATS data and the availability of test conversion files. Section III describes the final steps participants need to take in order to be ready for the participant system test.
I. Participant Testing Schedule
The following participant testing schedule depicts the types of testing participants can expect to participate in prior to implementation:
| mid October | Conversion "P"-Position file and end-of-day position reports available. Weekly conversion of end-of-day Friday data available on the following Monday. These weekly conversion files of participants current ACATS production data will continue until participant system testing commences. Once system testing starts on November 16th, production data will be converted based on the following schedule. |
| 11/16/1998 | Start participant testing of ACATS system with full functionality (all transaction types, etc.) available. Testing begins with no transfers in the system (i.e. without conversion data.) The test will include five (5) cycles during the day, which will be the same number of cycles processed when the system is implemented. Refer to chart on Page 6 which describes the 5 cycles and recaps timings of other output. |
| 12/18/1998 | Mock conversion weekend. "P"-Position file and reports available on Sun. (12/20.) Conversion data (from 12/18 production) is included on the "P" position files and reports and overlays participant testing system data. |
| 12/21/1998 | Participant testing continues including conversion data from end-of-business 12/18. |
| 01/08/1999 | Conversion dress rehearsal weekend. "P"-Position file and reports available on Saturday (01/09.) Support, timings, etc. same as live conversion weekend. Conversion data (from 1/08 production) is included on the "P" position files and reports and overlays participant testing system data. |
| 01/11/1999 | Participant testing continues including conversion data from end-of-business 01/08. |
| 01/15/1999 | Conversion dress rehearsal weekend. "P"-Position file and reports available on Sat. (01/16.) Support, timings, etc. same as live conversion weekend. Conversion data overlays participant testing system data. |
| 01/18/1999 | Participant testing continues including conversion data from end-of-business 01/15. |
| 01/21/1999 | Last day for participant testing of ACATS system. |
| 01/22/1999 | Live conversion weekend. See attached Conversion Document (EXHIBIT A) for additional details. |
| 01/25/1999 | Redesigned ACATS system in live production. |
II. CONVERSION
The following information relates to that part of participant testing which addresses the conversion of the current ACATS production data to the redesigned system:
A. CONVERSION SCHEDULE & RULES
Please refer to attached Conversion Document (Exhibit A), which documents the planned schedule for the ACATS conversion week-end beginning 1/22/99 and describes specific conversion rules. This is an updated version of the document which has been available on NSCCs ACATS website (acats.nscc.com).
B. CONVERSION TEST FILES and REPORTS
Beginning mid-October, NSCC will have available conversion test files and reports for participants to use as samples of the conversion files they will receive when the redesigned system is implemented in January 1999. These files and reports will be available weekly and contain end of day Friday production data which has been converted to the new ACATS. The files and reports will be available on the following Monday. NSCC will provide these conversion files up to the time that participant system testing commences mid-November.
The conversion data will be available by production Autoroute Product IDs as follows:
CONVERSION TEST DATA
| AUTOROUTE PRODUCT ID | FILE TYPE | RECORD TYPE | DESCRIPTION |
| 02090718 | MRO | Variable Record Type "P" |
ACATS Position EOD |
| 02090724 | MRO | Fixed Record Type "P" |
ACATS Position EOD |
| 02090711 | REPORT | EOD Transfer Transaction EOD Asset Transaction EOD Registration Detail EOD Default Registration |
EOD Member Reports |
Participants, who have already contacted the ACATS Participant Testing Group (PTG) and established network connectivity set-up procedures for test output, will be contacted regarding how they want to receive the test conversion files when they are available. Please note that the test conversion files will be using the production Autoroute Product IDs so participants may have a different set-up requirement than the test Autoroute Product IDs.
Participants will be advised by a separate Important Notice when the first test conversion files and report will be available.
III. FINAL STEPS TO PREPARE FOR PARTICIPANT SYSTEM TEST
A. FORMAT TESTING OF PARTICIPANT INPUT FILES IS REQUIRED PRIOR TO PARTICIPANT SYSTEM TEST-NOV. 16, 1998
Since June 23rd, participants have been able to submit
test input files to NSCC for format testing. NSCC has received test files and many
participants have successfully tested all three record types (TI, AT, FR). Participants
who have not contacted ACATS PTG to set up connectivity procedures or transmitted input
test files for format verification should do so as soon as possible. Participants will not
be able to participate in the Participant System Test until they have successfully
established network connectivity and submitted test input files for format verification
for all record types.
B. PROCEDURES TO RECEIVE PRODUCTION AUTOROUTE PRODUCTS
In addition to establishing set-up procedures for the test conversion files, participants will be asked by SIAC for production connectivity set-ups for the production Autoroute Product IDs they plan to receive. These set-ups may be different from the test set-ups. All production set-ups must be completed before participant system testing begins mid-November since all output processed by ACATS during participant system test will be utilizing production Autoroute Product IDs.
Participants, who have not contacted PTG for pre-formatted
files and reports which have been available since July 31st, should do so as soon as
possible so appropriate set-up procedures can be established. ACATS PTG can be contacted
at (212)383-4891. Participants are strongly encouraged to test output files
prior to the full system participant test scheduled for mid-November. Please refer to
NSCC Important Notice A4792 dated June 30, 1998 for the revised
testing and implementation dates.
C. PARTICIPANT PROFILE INFORMATION
Each ACATS participant will be contacted shortly by NSCC Marketing regarding various ACATS participant profile information which will be needed for the new system. Some examples of information needed include: whether participants will be set up for the new NSCC-GSCC link for transferring government securities and if NSCC should not automatically send Deliver Instructions to DTC for non-CNS DTC eligible securities.
In order to simulate how participants will process
transfers in the production environment, NSCC wants to update all profile information
prior to the participant system test in November. Once participants receive the profile
questionnaire, a timely response is needed.
D. PARTNERING OF PARTICIPANTS & GENERIC TEST SCRIPTS
The SIA Customer Account Transfer Division has taken an active role in preparing generic test scripts which participants can utilize for their testing of the redesigned ACATS. These test scripts have been available on NSCCs ACATS Website (acats.nscc.com) and the Customer Account Transfer Division Web Site (sia.com/about_sia/html/cat.html).
In addition to preparing these test scripts, the Customer
Account Transfer Division is in the process of setting up test partners to facilitate the
ACATS participant system test beginning in November. Participants should expect a
notification shortly from the Division with specifics regarding the assigned partners.
E. PC WEB DIRECT USERS
NSCC expects to have its new PC Web Direct for ACATS application available for participant system testing in November. Participants, who expect to utilize PC Web Direct for ACATS input and/or receipt of Autoroute Product output, must notify their NSCC Account Manager to make sure that all necessary PC Web Direct set-up procedures have been completed prior to the ACATS participant system test in mid-November.
In addition, participants who plan to use PC Web Direct to
receive the new ACATS Autoroute Products (files/reports) need to be set up in Autoroute
prior to the participant system test in November. Participants who have indicated they
plan to use PC Web Direct will be contacted shortly regarding the list of Autoroute
Products they may want to receive via PC Web Direct. The list of the new ACATS production
Autoroute Product IDs can be found in NSCC Important Notice A4773,
dated May 26, 1998.
F. PREPARE INPUT AND OUTPUT CYCLES BASED ON NEW ACATS MULTI-CYCLE TIMING
The frequency of the ACATS cycles will be changed from 8 cycles to 5 cycles per day as follows. These new cycles will also be followed during the participant system test. Please note that there is no change to the previous published input cut-off times for the various transaction types:
| CYCLE NO | INPUT CUTOFF TIME (EST) | TRANSACTION CUTOFF | MULTI-CYCLE OUTPUT TIME (EST) "M" file and Print Image Reports |
| 1 | 8:00 am | None | 9:00 am |
| 2 | 10:00 am | None | 11:00 am |
| 3 | 12:00 pm | Standard & Non-Standard Transfers | 1:00 pm |
| 4 | 2:00 pm | Asset adds,changes and deletes Deliverer rejects | 3:00 pm |
| 5 | 4:00 pm | Transfer adjustments and accelerations Receiver rejects; Fund Registrations |
5:00 pm |
SUMMARY OF SINGLE CYCLE OUTPUTIn addition to the multi-cycle output, participants can receive other single cycle output at the following times.
| OUTPUT TIME (EST) | OUTPUT FILE/REPORT CONTENTS |
| 9:00 am | Interface Rejects: "I" file and reports |
| 1:30 pm | ACATS-Fund/SERV Statistics: "F" file and Reports |
| 6:00 pm | End-of-Day Transaction Summary: "E" file |
| 8:00 pm | All other end of day MRO and report print image files: "P", "S" |
All ACATS Redesign Important Notices and file layouts are available on NSCCs ACATS Website at http://acats.nscc.com. In addition, the ACATS Website contains Frequently Asked Questions and various technical documents. Any questions pertaining to this notice should be directed to the undersigned at (212) 412-8686 or E-Mail at emeringolo@nscc.com. Additionally, general ACATS questions can be directed to NSCCs Participant Services Department at (212) 412-8432. General Mutual Fund questions regarding ACATS Fund/SERV can be directed to the Mutual Fund Hotline at (212) 412-8893.
Edlyn Meringolo
Vice President
Product Development
EXHIBIT A
ACATS CONVERSION
General Overview and Timing
| 01/22/99 | 12:00 | Cutoff time for participant input into old ACATS system. No old ACATS input (CPU-CPU, PC Platform or keypunch) will be accepted after this time. |
| 01/22/99 | 16:00 | Produce all MRO and reports from old ACATS system. Last MRO/reports from old system. |
| 01/22/99 | 16:00 | NSCC/SIAC begin ACATS conversion to new ACATS system. |
| 01/23/99 | Late After Noon | ACATS conversion complete. Participants can receive the 02090718 variable length or 02090724 fixed length AutoRoute "ACATS Transfer Position MRO" file. This is the post-conversion, redesigned ACATS position file. Participants can receive the "ACATS Asset Detail Report As Receiver/Deliverer" print image AutoRoute (product number 02090711.) |
| 01/23/99 | 20:00 | Participants can begin sending redesigned ACATS transaction files (DataTrak SYSIDs 36667 - variable length or 32667 - fixed length) |
| 01/25/99 | 08:00 | First redesigned ACATS multi-batch inputs processed. |
| 01/25/99 | thru 16:00 | Participants can submit intra-day redesigned ACATS transaction files (DataTrak SYSIDs 36667 - variable length or 32667 - fixed length) |
| 01/25/99 | 09:00 thru 17:00 | AutoRoute 02090716 variable and 02090722 fixed length "Multi-Cycle Transaction MRO" files available for participants. |
Conversion Specifics - General
The following comments pertain to all record types on the
"P" ACATS Transfer Position MRO post conversion file.
ACATS Control Number
ACATS control numbers will be converted from the current JJJNNNNN format where:
| JJJ | Julian date of submission for full account transfers and Julian date of submission+400 for residual transfers |
| NNNNN | sequentially assigned |
to new format CCYYJJJNNNNNNN where:
| CCYY | Y2K year of submission |
| JJJ | Julian date of submission |
| NNNNNNN | sequentially assigned |
NOTE: for converted ACATS control numbers only
residual credit ACATS control numbers will remain Julian date of submission+400, avoiding
duplicate control numbers.
Dates
All dates will be converted to the new Y2K compliant date
formats of CCYYMMDD or MMYYCC (for options) as per the new input format rules.
Quantities
All quantity fields will be converted to the equivalent
input format rules.
Status:
The following table summarizes the conversion rules for Statuss:| Old Status | New Status | New Status Code | Old Days in Status | New Days in Status |
| New | Request | 100 | 1 | 1 |
| New | Request | 100 | 2 | 2 |
| New | Request | 100 | 3 | 3 |
| New Past | Request Past | 130 | 4 | 1 |
| New Past | Request Past | 130 | 5 | 2 |
| New Past | Request Past | 130 | 6 | 3 |
| New Past | Request Past | 130 | 7 | 4 |
| New Past | Request Past | 130 | 8 | 5 |
| New Past | Request Past | 130 | 9 | 6 |
| New Past | Request Past | 130 | 10 | 7 |
| Pend | Review | 200 | 1 | 1 |
| Pend | Review | 200 | 2 | 2 |
| Pend Adjust | Review Adjust | 210 | 1 | 1 |
| Pend Adjust | Review Adjust | 210 | 2 | 2 |
| Pend Err | Review Error | 220 | 1 | 1 |
| Pend Err | Review Error | 220 | 2 | 2 |
| Pend Err | Review Error | 220 | 3 | 3 |
| Pend Err | Review Error | 220 | 4 | 4 |
| Pend Err | Review Error | 220 | 5 | 5 |
| Pend Err | Review Error | 220 | 6 | 6 |
| Pend Err | Review Error | 220 | 7 | 7 |
| Settl-1 | Settle Prep | 300 | 1 | 1 |
| Close Sett | Settle Close | 310 | 1 | 1 |
| Close Purge | Close Purge | 400 | 1 | 1 |
| Memo Purge | Close Purge | 400 | 1 | 1 |
| Old Status | New Status | New Status Code | Old Days in Status | New Days in Status |
| Pend Adjust | Review | 200 | 1 or 2 | 1 or 2 |
| Pend Err | Reject | 600 | any | 1 |
Note:
Conversion Specifics - Transfer Initiation
Account Numbers
Both receiver and deliverer customer account numbers will be left justified with all blanks/spaces, special characters and non-printable removed. If the resulting customer account number would be null (i.e. originally the customer account number consisted exclusively of blanks/spaces, special characters or non-printable characters) then the customer account number will be set to:
"XXXXXXXXXXXXXXXXXXXX"
(i.e. twenty (20) "X" characters.)
Transfer Type
The transfer type will be set to "FUL" (full account transfers) when the JJJ portion of the old ACATS control number is less than 400. The transfer type will be set to "RCR" (residual credit) when the JJJ portion of the old ACATS control number is greater than 400.
Original Receiver Customer Account Type
The customer account type will be converted per the following table:
| Account Type Description | Old Account Type Code | New Account Type Code |
| Single Account | 01 | SN |
| Joint Account | 02 | JT |
| Direct Rollover | 03 | DR |
| IRA | 04 | IR |
| Qualified/Profit Sharing/Pension | 05 | QP |
| Other | 06 | OT |
| Estate Account | 07 | ES |
| Custodian (UGMA) | 08 | CU |
| Trust Account | 09 | TR |
| Corporate Account | 10 | CO |
Transfer Type Reject codes will be converted per the following table:
| Old Reject Description | Old Reject Code | New Reject Code |
| SSN/Tax ID Mismatch | 01 | 01 |
| Account Title Mismatch | 02 | 02 |
| Documentation Needed | 03 | 03 |
| Account Flat | 04 | 04 |
| Invalid Account Number | 05 | 05 |
| Duplicate | 06 | 06 |
| Account Type Mismatch | 07 | 03 |
| Missing Authorization Signature | 08 | 09 |
| Acct. in Distribution or Transfer | 09 | 07 |
| Client Rescinded | 10 | 08 |
| Violates Credit Policy | 21 | 21 |
| Unrecognized for Residual Credit | 22 | 22 |
| NSCC Ceases to Act | n/a | 99 |
The old ACATS system allowed Residual Credit transfers to be in Pend-Err status. The redesigned ACATS system has no equivalent status. All Residual Credit transfers which were in Pend-Err status will be converted to Status 600-Reject with the Reject Code set to 99-NSCC Ceases to Act.
Conversion Specifics - Assets
Asset Pricing Category
Asset Pricing Category codes will be converted per the following table:
| Old Asset Pricing Category Description | Old Code | New Code |
| Corporate Bonds | CB | CORP |
| CDs & Commercial Paper | CD | CDCP |
| Equities | ES | EQU |
| Foreign Security | FS | FEQU |
| US Govt, US Agency, Foreign Govt Bonds | GB | GOVT |
| Limited Partnerships | LP | LPAR |
| Municipal Bonds | MB | MUNI |
| Mutual Funds, No Money Market | MF | MFNM |
| Money Market Mutual Funds | MM | MFMM |
| Mortgage Backed | MO | MBS |
| Other | OO | OTH |
| UITs | UN | UIT |
| Zero Coupon | ZC | ZERO |
Note:
The ISIN Security Issue ID is the US CUSIP from the existing system and is a direct conversion except the ACATS created CUSIPs of 888888888 and 999999999 for credit Cash and debit Cash, respectively, will be set to spaces.
"User CUSIPs" (i.e. ISIN Security Issue IDs not on the ACATS security files submitted by a participant) will continue to be shown to the submitter (deliverer) and be spaces for the contra (receiver).
ISIN Country, ISIN Check Digit
The ISIN Country Code will be "US" and the ISIN Check Digit computed for all assets with a CUSIP/ISIN Security in all asset pricing categories. This conversion rule also holds when the asset pricing category on conversion was set to "FEQU" - Foreign Equity, reflecting the current practice of only transferring ADRs in the existing ACATS Foreign Securities category.
Asset Description
Settling Location and Settling Location ReasonFor User CUSIPs (see above), the last 28 characters of the Asset Description will be converted to say "Submitter ISIN: xxxxxxxxxxxx" where xxxxxxxxxxxx resulting ISIN number. This description change follows the rules for User CUSIPs in the new system and the changed description will be sent to both the submitting (always deliverer for conversion) and contra (always receiver for conversion) party.
For residual credit transfers the new ACATS system has individual fields for Associated ACATS Control Number and Associated Settlement Date. In the existing system residual credit Associated ACATS Control Number and Associated Settlement Date data is carried in a portion of the Asset Description. The conversion will:
- populate the Associated ACATS Control Number unchanged (i.e. in the existing ACATS Control Number format)
- populate the Associated Settlement Date in the new date format
- remove this data from the Asset Description replacing with spaces
The old Settlement Indicator field will be used to determine the new Settling Location and Settling Location Reason as per the following table:
| Old Settlement Indicator Description |
Old Settlement Indicator |
New Settlement Location |
New Settlement Location Reason |
| CNS | 1 | 05 | spaces |
| X-CNS | 2 | 50 | XSET |
| Non-CNS, Delayed Delivery | 3 | 50 | DDEL |
| Non Deliverable | 4 | 30 | spaces |
| Cash Balance | 5 | 40 | CRED if CUSIP was all "8"s DEB if CUSIP was all "9"s |
| Option | 6 | 35 | OPT |
| Safekeeping | 7 | 50 | SFK |
| Mutual Fund Book Entry | 8 | 10 | spaces |
| Memo Only | M | 45 | COMT |
| Restricted | R | 50 | RSEC |
| Special Misc. Account | S | 45 | SMA |
| Underlying Security | U | 45 if Asset Type is 0 35 if Asset Type is not 0 |
USEC |
| Expiring Option | E | 35 | EXPO |
| Underlying Cash Bal. | C | 45 | CASH |
The Bearer Bond field is set to "B" when the old ACATS bond security type is "B". For all other values the Bearer Bond field is set to "N"
When Issued Indicator
The When Issued field is set to "W" when the old ACATS bond security type is "W". For all other values the When Issued field is set to "N".
Mutual Fund Full/Partial Indicator
For Fund/SERV eligible mutual fund assets, the new ACATS Mutual Fund Full/Partial Indicator will be set to "2" - Partial Transfer.
Conversion Specifics - Fund Registrations
Default Registrations Will Only Be Converted for Status 300-Settle Prep and 310-Settle Close
The current ACATS system creates and transmits default registrations upon receipt of a Fund/SERV eligible mutual fund asset. The redesigned ACATS system creates default registrations only upon aging an account transfer to Status 300-Settle Prep or
310-Settle Close. All default registrations in any Status less than 300-Settle Prep will not be converted.
New Fund Registration Fields Default to Spaces
Since the ACATS Fund Registration record has been made consistent with the Fund/SERV registration record there are many fields which have been added. All new fields will be set to spaces.
The following fields are conditionally required fields in the new ACATS system which will be converted to spaces even though these fields are usually constrained to a list of acceptable values:
- Account Transfer Disbursement - Accruals Code
- Account Transfer Disbursement - Fractional/Cash-in-Lieu Code
- Account Transfer Disbursement - Residuals Code
- CDSC Payment Code
- Disbursement Option Code
- Monthly Payment Indicators
- Payment Date Value
- Retirement Tax Code
- Shareholder Bank Account Type
- Cost Basis Option Code
- Alternate Payable 1 Indicator
Fund Account Indicator
The new ACATS Fund Account Indicator has less options than the old ACATS acceptable values. Conversion will be as follows:
| Old Fund Account Indicator Description | Old Code | New Code |
| New Account - Domestic | 00 | 00 |
| New Account - Foreign | 01 | 01 |
| Existing Account - Domestic | 02 | 02 |
| Existing Account - Foreign | 03 | 03 |
| Network New Account - Domestic | 04 | 00 |
| Network New Account - Foreign | 05 | 01 |
| Network Existing Acct. - Domestic | 06 | 02 |
| Network Existing Acct. - Foreign | 07 | 03 |