Important Notice

A 4830 - September 21, 1998
P&S 4394

TO: ALL PARTICIPANTS

ATTENTION:  MANAGING PARTNER/OFFICER; OPERATIONS PARTNER/OFFICER; MANAGER CUSTOMER ACCOUNT TRANSFER DEPARTMENT; MANAGER MARGIN DEPARTMENT; MANAGER DATA PROCESSING DEPARTMENT; MANAGER MUTUAL FUNDS OPERATIONS; MANAGER CASHIERS DEPARTMENT

SUBJECT: ACATS REDESIGN - CONVERSION TESTS AND PARTICIPANT SYSTEM TEST INFORMATION


On Monday, January 25, 1999 and subject to SEC approval, NSCC plans to implement the redesign of the Automated Customer Account Transfer Service (ACATS). This notice provides information regarding the next phase of participant testing. It provides a detailed timeline of participant testing scheduled from mid-October through the implementation of the redesigned system. Part of the implementation is a conversion of data from the current system to the new system. Specific information regarding this conversion and the availability of conversion test files is contained on the following pages.

Additionally, specific information is being provided to aid participants in preparation for the ACATS participant system testing scheduled to begin Monday, November 16, 1998. Participants should have completed their network connectivity and format testing prior to the participant system test. Specific information needed from participants prior to Nov. 16th is documented on the following pages.

Section I describes the Participant Testing Schedule. Section II describes Conversion, which includes the schedule for conversion week-end beginning January 22, 1999; rules for converting current ACATS data to the redesigned ACATS data and the availability of test conversion files. Section III describes the final steps participants need to take in order to be ready for the participant system test.

 

I. Participant Testing Schedule

The following participant testing schedule depicts the types of testing participants can expect to participate in prior to implementation:

mid October Conversion "P"-Position file and end-of-day position reports available. Weekly conversion of end-of-day Friday data available on the following Monday. These weekly conversion files of participant’s current ACATS production data will continue until participant system testing commences. Once system testing starts on November 16th, production data will be converted based on the following schedule.
11/16/1998 Start participant testing of ACATS system with full functionality (all transaction types, etc.) available. Testing begins with no transfers in the system (i.e. without conversion data.) The test will include five (5) cycles during the day, which will be the same number of cycles processed when the system is implemented. Refer to chart on Page 6 which describes the 5 cycles and recaps timings of other output.
12/18/1998 Mock conversion weekend. "P"-Position file and reports available on Sun. (12/20.) Conversion data (from 12/18 production) is included on the "P" position files and reports and overlays participant testing system data.
12/21/1998 Participant testing continues including conversion data from end-of-business 12/18.
01/08/1999 Conversion dress rehearsal weekend. "P"-Position file and reports available on Saturday (01/09.) Support, timings, etc. same as live conversion weekend. Conversion data (from 1/08 production) is included on the "P" position files and reports and overlays participant testing system data.
01/11/1999 Participant testing continues including conversion data from end-of-business 01/08.
01/15/1999 Conversion dress rehearsal weekend. "P"-Position file and reports available on Sat. (01/16.) Support, timings, etc. same as live conversion weekend. Conversion data overlays participant testing system data.
01/18/1999 Participant testing continues including conversion data from end-of-business 01/15.
01/21/1999 Last day for participant testing of ACATS system.
01/22/1999 Live conversion weekend. See attached Conversion Document (EXHIBIT A) for additional details.
01/25/1999 Redesigned ACATS system in live production.

II. CONVERSION

The following information relates to that part of participant testing which addresses the conversion of the current ACATS production data to the redesigned system:


A. CONVERSION SCHEDULE & RULES

Please refer to attached Conversion Document (Exhibit A), which documents the planned schedule for the ACATS conversion week-end beginning 1/22/99 and describes specific conversion rules. This is an updated version of the document which has been available on NSCC’s ACATS website (acats.nscc.com).

 

B. CONVERSION TEST FILES and REPORTS

Beginning mid-October, NSCC will have available conversion test files and reports for participants to use as samples of the conversion files they will receive when the redesigned system is implemented in January 1999. These files and reports will be available weekly and contain end of day Friday production data which has been converted to the new ACATS. The files and reports will be available on the following Monday. NSCC will provide these conversion files up to the time that participant system testing commences mid-November.

The conversion data will be available by production Autoroute Product IDs as follows:

CONVERSION TEST DATA

AUTOROUTE PRODUCT ID FILE TYPE RECORD TYPE DESCRIPTION
02090718 MRO Variable

Record Type "P"

ACATS Position EOD
02090724 MRO Fixed

Record Type "P"

ACATS Position

EOD

02090711 REPORT EOD Transfer Transaction

EOD Asset Transaction

EOD Registration Detail

EOD Default Registration

EOD Member Reports

Participants, who have already contacted the ACATS Participant Testing Group (PTG) and established network connectivity set-up procedures for test output, will be contacted regarding how they want to receive the test conversion files when they are available. Please note that the test conversion files will be using the production Autoroute Product IDs so participants may have a different set-up requirement than the test Autoroute Product IDs.

Participants will be advised by a separate Important Notice when the first test conversion files and report will be available.

 

III. FINAL STEPS TO PREPARE FOR PARTICIPANT SYSTEM TEST

A. FORMAT TESTING OF PARTICIPANT INPUT FILES IS REQUIRED PRIOR TO PARTICIPANT SYSTEM TEST-NOV. 16, 1998

Since June 23rd, participants have been able to submit test input files to NSCC for format testing. NSCC has received test files and many participants have successfully tested all three record types (TI, AT, FR). Participants who have not contacted ACATS PTG to set up connectivity procedures or transmitted input test files for format verification should do so as soon as possible. Participants will not be able to participate in the Participant System Test until they have successfully established network connectivity and submitted test input files for format verification for all record types.

B. PROCEDURES TO RECEIVE PRODUCTION AUTOROUTE PRODUCTS

In addition to establishing set-up procedures for the test conversion files, participants will be asked by SIAC for production connectivity set-ups for the production Autoroute Product IDs they plan to receive. These set-ups may be different from the test set-ups. All production set-ups must be completed before participant system testing begins mid-November since all output processed by ACATS during participant system test will be utilizing production Autoroute Product IDs.

Participants, who have not contacted PTG for pre-formatted files and reports which have been available since July 31st, should do so as soon as possible so appropriate set-up procedures can be established. ACATS PTG can be contacted at (212)383-4891. Participants are strongly encouraged to test output files prior to the full system participant test scheduled for mid-November. Please refer to NSCC Important Notice A4792 dated June 30, 1998 for the revised testing and implementation dates.

C. PARTICIPANT PROFILE INFORMATION

Each ACATS participant will be contacted shortly by NSCC Marketing regarding various ACATS participant profile information which will be needed for the new system. Some examples of information needed include: whether participants will be set up for the new NSCC-GSCC link for transferring government securities and if NSCC should not automatically send Deliver Instructions to DTC for non-CNS DTC eligible securities.

In order to simulate how participants will process transfers in the production environment, NSCC wants to update all profile information prior to the participant system test in November. Once participants receive the profile questionnaire, a timely response is needed.

D. PARTNERING OF PARTICIPANTS & GENERIC TEST SCRIPTS

The SIA Customer Account Transfer Division has taken an active role in preparing generic test scripts which participants can utilize for their testing of the redesigned ACATS. These test scripts have been available on NSCC’s ACATS Website (acats.nscc.com) and the Customer Account Transfer Division Web Site (sia.com/about_sia/html/cat.html).

In addition to preparing these test scripts, the Customer Account Transfer Division is in the process of setting up test partners to facilitate the ACATS participant system test beginning in November. Participants should expect a notification shortly from the Division with specifics regarding the assigned partners.

E. PC WEB DIRECT USERS

NSCC expects to have its new PC Web Direct for ACATS application available for participant system testing in November. Participants, who expect to utilize PC Web Direct for ACATS input and/or receipt of Autoroute Product output, must notify their NSCC Account Manager to make sure that all necessary PC Web Direct set-up procedures have been completed prior to the ACATS participant system test in mid-November.

In addition, participants who plan to use PC Web Direct to receive the new ACATS Autoroute Products (files/reports) need to be set up in Autoroute prior to the participant system test in November. Participants who have indicated they plan to use PC Web Direct will be contacted shortly regarding the list of Autoroute Products they may want to receive via PC Web Direct. The list of the new ACATS production Autoroute Product IDs can be found in NSCC Important Notice A4773, dated May 26, 1998.

F. PREPARE INPUT AND OUTPUT CYCLES BASED ON NEW ACATS MULTI-CYCLE TIMING

The frequency of the ACATS cycles will be changed from 8 cycles to 5 cycles per day as follows. These new cycles will also be followed during the participant system test. Please note that there is no change to the previous published input cut-off times for the various transaction types:

CYCLE NO INPUT CUTOFF TIME (EST) TRANSACTION CUTOFF MULTI-CYCLE OUTPUT TIME (EST) "M" file and Print Image Reports
1 8:00 am None 9:00 am
2 10:00 am None 11:00 am
3 12:00 pm Standard & Non-Standard Transfers 1:00 pm
4 2:00 pm Asset adds,changes and deletes Deliverer rejects 3:00 pm
5 4:00 pm Transfer adjustments and accelerations

Receiver rejects; Fund Registrations

5:00 pm


SUMMARY OF SINGLE CYCLE OUTPUT

In addition to the multi-cycle output, participants can receive other single cycle output at the following times.

OUTPUT TIME (EST) OUTPUT FILE/REPORT CONTENTS
9:00 am Interface Rejects: "I" file and reports
1:30 pm ACATS-Fund/SERV Statistics: "F" file and Reports
6:00 pm End-of-Day Transaction Summary: "E" file
8:00 pm All other end of day MRO and report print image files: "P", "S"

All ACATS Redesign Important Notices and file layouts are available on NSCC’s ACATS Website at http://acats.nscc.com. In addition, the ACATS Website contains Frequently Asked Questions and various technical documents. Any questions pertaining to this notice should be directed to the undersigned at (212) 412-8686 or E-Mail at emeringolo@nscc.com. Additionally, general ACATS questions can be directed to NSCC’s Participant Services Department at (212) 412-8432. General Mutual Fund questions regarding ACATS Fund/SERV can be directed to the Mutual Fund Hotline at (212) 412-8893.

Edlyn Meringolo
Vice President
Product Development


EXHIBIT A

ACATS CONVERSION

General Overview and Timing

01/22/99 12:00 Cutoff time for participant input into old ACATS system. No old ACATS input (CPU-CPU, PC Platform or keypunch) will be accepted after this time.
01/22/99 16:00 Produce all MRO and reports from old ACATS system. Last MRO/reports from old system.
01/22/99 16:00 NSCC/SIAC begin ACATS conversion to new ACATS system.
01/23/99 Late After Noon ACATS conversion complete. Participants can receive the 02090718 variable length or 02090724 fixed length AutoRoute "ACATS Transfer Position MRO" file. This is the post-conversion, redesigned ACATS position file. Participants can receive the "ACATS Asset Detail Report As Receiver/Deliverer" print image AutoRoute (product number 02090711.)
01/23/99  20:00 Participants can begin sending redesigned ACATS transaction files (DataTrak SYSID’s 36667 - variable length or 32667 - fixed length)
01/25/99 08:00 First redesigned ACATS multi-batch inputs processed.
01/25/99 thru 16:00 Participants can submit intra-day redesigned ACATS transaction files (DataTrak SYSID’s 36667 - variable length or 32667 - fixed length)
01/25/99 09:00 thru 17:00 AutoRoute 02090716 variable and 02090722 fixed length "Multi-Cycle Transaction MRO" files available for participants.


Conversion Specifics - General

The following comments pertain to all record types on the "P" ACATS Transfer Position MRO post conversion file.

ACATS Control Number

ACATS control numbers will be converted from the current JJJNNNNN format where:

JJJ Julian date of submission for full account transfers and Julian date of submission+400 for residual transfers
NNNNN sequentially assigned

to new format CCYYJJJNNNNNNN where:

CCYY Y2K year of submission
JJJ Julian date of submission
NNNNNNN sequentially assigned

NOTE: for converted ACATS control numbers only residual credit ACATS control numbers will remain Julian date of submission+400, avoiding duplicate control numbers.

Dates

All dates will be converted to the new Y2K compliant date formats of CCYYMMDD or MMYYCC (for options) as per the new input format rules.

Quantities

All quantity fields will be converted to the equivalent input format rules.

Status:

The following table summarizes the conversion rules for Status’s:

Old Status New Status New Status Code Old Days in Status New Days in Status
New Request 100 1 1
New Request 100 2 2
New Request 100 3 3
New Past Request Past 130 4 1
New Past Request Past 130 5 2
New Past Request Past 130 6 3
New Past Request Past 130 7 4
New Past Request Past 130 8 5
New Past Request Past 130 9 6
New Past Request Past 130 10 7
Pend Review 200 1 1
Pend Review 200 2 2
Pend Adjust Review Adjust 210 1 1
Pend Adjust Review Adjust 210 2 2
Pend Err Review Error 220 1 1
Pend Err Review Error 220 2 2
Pend Err Review Error 220 3 3
Pend Err Review Error 220 4 4
Pend Err Review Error 220 5 5
Pend Err Review Error 220 6 6
Pend Err Review Error 220 7 7
Settl-1 Settle Prep 300 1 1
Close Sett Settle Close 310 1 1
Close Purge Close Purge 400 1 1
Memo Purge Close Purge 400 1 1

Note: In the redesigned ACATS system, day 2 of Review or Review Adjust status is normally only used for holiday processing. During the conversion day 2 of Review or Review Adjust will be used for those transfers which in the old system would be in the second day of Pend or Pend Adjust status, respectively.

For conversion of residual credit non-standard transfers, the above table will be used except as follows:

Old Status New Status New  Status Code Old  Days in Status New Days in Status
Pend Adjust Review 200 1 or 2 1 or 2
Pend Err Reject 600 any 1


Note:

  1. Pre-conversion residual credit transfers in Pend-Err status’s will be set to 600-Rejected status. These ACATS conversion related rejected transfers will have a Reject Reason Code of 99-NSCC Ceases to Act.
  2. After conversion to the new system it will not be possible to add or change assets to a residual credit transfer. This change is consistent with the manner non-standard transfers are processed in the new ACATS system.

General Editing Rules

The existing ACATS system does not always check that the value of each field is within the acceptable values for the field. Excluding those cases where special conversion actions are taken as detailed within this document, unacceptable values will be converted to:

Conversion Specifics - Transfer Initiation

Account Numbers

Both receiver and deliverer customer account numbers will be left justified with all blanks/spaces, special characters and non-printable removed. If the resulting customer account number would be null (i.e. originally the customer account number consisted exclusively of blanks/spaces, special characters or non-printable characters) then the customer account number will be set to:

"XXXXXXXXXXXXXXXXXXXX"

(i.e. twenty (20) "X" characters.)

Transfer Type

The transfer type will be set to "FUL" (full account transfers) when the JJJ portion of the old ACATS control number is less than 400. The transfer type will be set to "RCR" (residual credit) when the JJJ portion of the old ACATS control number is greater than 400.

Original Receiver Customer Account Type

The customer account type will be converted per the following table:

Account Type Description Old Account Type Code New Account Type Code
Single Account 01 SN
Joint Account 02 JT
Direct Rollover 03 DR
IRA 04 IR
Qualified/Profit Sharing/Pension 05 QP
Other 06 OT
Estate Account 07 ES
Custodian (UGMA) 08 CU
Trust Account 09 TR
Corporate Account 10 CO


Transfer Type Reject Codes

Transfer Type Reject codes will be converted per the following table:

Old Reject Description Old Reject Code New Reject Code
SSN/Tax ID Mismatch 01 01
Account Title Mismatch 02 02
Documentation Needed 03 03
Account Flat 04 04
Invalid Account Number 05 05
Duplicate 06 06
Account Type Mismatch 07 03
Missing Authorization Signature 08 09
Acct. in Distribution or Transfer 09 07
Client Rescinded 10 08
Violates Credit Policy 21 21
Unrecognized for Residual Credit 22 22
NSCC Ceases to Act n/a 99

Note: the old ACATS system had an "07" Account Type Mismatch code which does not exist in the new system. This has been mapped to code "03" Documentation Needed.

The old ACATS system allowed Residual Credit transfers to be in Pend-Err status. The redesigned ACATS system has no equivalent status. All Residual Credit transfers which were in Pend-Err status will be converted to Status 600-Reject with the Reject Code set to 99-NSCC Ceases to Act.


Conversion Specifics - Assets

Asset Pricing Category

Asset Pricing Category codes will be converted per the following table:

Old Asset Pricing Category Description Old Code New Code
Corporate Bonds CB CORP
CD’s & Commercial Paper CD CDCP
Equities ES EQU
Foreign Security FS FEQU
US Gov’t, US Agency, Foreign Gov’t Bonds GB GOVT
Limited Partnerships LP LPAR
Municipal Bonds MB MUNI
Mutual Funds, No Money Market MF MFNM
Money Market Mutual Funds MM MFMM
Mortgage Backed MO MBS
Other OO OTH
UIT’s UN UIT
Zero Coupon ZC ZERO

Note:

  1. All Foreign Securities go to the new Foreign Equities category.
  2. Some asset types do not need pricing categories (40-Cash, 45-Comments, etc.) When carried on the old ACATS system the converted Pricing Category for these asset types will be spaces, consistent with the new system edits.

ISIN Security Issue ID

The ISIN Security Issue ID is the US CUSIP from the existing system and is a direct conversion except the ACATS created CUSIPs of ‘888888888’ and ‘999999999’ for credit Cash and debit Cash, respectively, will be set to spaces.

"User CUSIPs" (i.e. ISIN Security Issue ID’s not on the ACATS security files submitted by a participant) will continue to be shown to the submitter (deliverer) and be spaces for the contra (receiver).

ISIN Country, ISIN Check Digit

The ISIN Country Code will be "US" and the ISIN Check Digit computed for all assets with a CUSIP/ISIN Security in all asset pricing categories. This conversion rule also holds when the asset pricing category on conversion was set to "FEQU" - Foreign Equity, reflecting the current practice of only transferring ADR’s in the existing ACATS Foreign Securities category.

Asset Description

For User CUSIPs (see above), the last 28 characters of the Asset Description will be converted to say "Submitter ISIN: xxxxxxxxxxxx" where xxxxxxxxxxxx resulting ISIN number. This description change follows the rules for User CUSIPs in the new system and the changed description will be sent to both the submitting (always deliverer for conversion) and contra (always receiver for conversion) party.

For residual credit transfers the new ACATS system has individual fields for Associated ACATS Control Number and Associated Settlement Date. In the existing system residual credit Associated ACATS Control Number and Associated Settlement Date data is carried in a portion of the Asset Description. The conversion will:

  1. populate the Associated ACATS Control Number unchanged (i.e. in the existing ACATS Control Number format)
  2. populate the Associated Settlement Date in the new date format
  3. remove this data from the Asset Description replacing with spaces

Settling Location and Settling Location Reason

The old Settlement Indicator field will be used to determine the new Settling Location and Settling Location Reason as per the following table:

Old Settlement
Indicator
Description
Old
Settlement
Indicator
New
Settlement
Location
New
Settlement
Location
Reason
CNS 1 05 spaces
X-CNS 2 50 XSET
Non-CNS, Delayed Delivery 3 50 DDEL
Non Deliverable 4 30 spaces
Cash Balance 5 40 CRED if CUSIP was all "8"s DEB if CUSIP was all "9"s
Option 6 35 OPT
Safekeeping 7 50 SFK
Mutual Fund Book Entry 8 10 spaces
Memo Only M 45 COMT
Restricted R 50 RSEC
Special Misc. Account S 45 SMA
Underlying Security U 45 if Asset Type is 0

35 if Asset Type is not 0

USEC
Expiring Option E 35 EXPO
Underlying Cash Bal. C 45 CASH


Bearer Bond Indicator

The Bearer Bond field is set to "B" when the old ACATS bond security type is "B". For all other values the Bearer Bond field is set to "N"

When Issued Indicator

The When Issued field is set to "W" when the old ACATS bond security type is "W". For all other values the When Issued field is set to "N".

Mutual Fund Full/Partial Indicator

For Fund/SERV eligible mutual fund assets, the new ACATS Mutual Fund Full/Partial Indicator will be set to "2" - Partial Transfer.

Conversion Specifics - Fund Registrations

Default Registrations Will Only Be Converted for Status 300-Settle Prep and 310-Settle Close

The current ACATS system creates and transmits default registrations upon receipt of a Fund/SERV eligible mutual fund asset. The redesigned ACATS system creates default registrations only upon aging an account transfer to Status 300-Settle Prep or

310-Settle Close. All default registrations in any Status less than 300-Settle Prep will not be converted.

New Fund Registration Fields Default to Spaces

Since the ACATS Fund Registration record has been made consistent with the Fund/SERV registration record there are many fields which have been added. All new fields will be set to spaces.

The following fields are conditionally required fields in the new ACATS system which will be converted to spaces even though these fields are usually constrained to a list of acceptable values:

  • Account Transfer Disbursement - Accruals Code
  • Account Transfer Disbursement - Fractional/Cash-in-Lieu Code
  • Account Transfer Disbursement - Residuals Code
  • CDSC Payment Code
  • Disbursement Option Code
  • Monthly Payment Indicators
  • Payment Date Value
  • Retirement Tax Code
  • Shareholder Bank Account Type
  • Cost Basis Option Code
  • Alternate Payable 1 Indicator

Fund Account Indicator

The new ACATS Fund Account Indicator has less options than the old ACATS acceptable values. Conversion will be as follows:

Old Fund Account Indicator Description Old Code New Code
New Account - Domestic 00 00
New Account - Foreign 01 01
Existing Account - Domestic 02 02
Existing Account - Foreign 03 03
Network New Account - Domestic 04 00
Network New Account - Foreign 05 01
Network Existing Acct. - Domestic 06 02
Network Existing Acct. - Foreign 07 03